Rivermark
Facts:
Principle Contractor: Taylor Wimpey
Status: In Progress
Ventflowuk has been appointed to undertake the supply, installation and commissioning of MVHR systems serving 530 apartments within the landmark Rivermark development. This major riverside regeneration scheme reinforces Ventflowuk’s growing role in delivering large-scale residential ventilation solutions across London.
Our expert teams are providing high-efficiency MVHR installations designed to ensure exceptional indoor air quality, energy recovery performance and regulatory compliance throughout the development.
West Hendon, London
Facts:
Principal Contractor – Barratt Homes
Status: In Progress
Ventflowuk has been contracted to deliver the supply, installation, testing and commissioning of MVHR systems, purge ventilation systems and MVHR cooling systems for Blocks C1, C2, C3 and C4 within this large scale residential development in West Hendon, comprising a total of 236 apartments.
Barking Riverside, London
Facts:
Main Contractor – Bellway London
Status: In Progress
Ventflowuk is proud to be delivering ventilation services for another large-scale residential project.
We have been appointed to supply, install and commission two high performance Mechanical Ventilation Heat Recovery (MVHR) systems across multiple residential blocks as part of an ongoing project.
System 1: MRXBOXAB-ECO5+MR-ECO-COOL-V
This advanced MVHR system with integrated cooling is being installed to provide energy efficient ventilation with the added benefit of temperature control during the warmer months.
Installation Breakdown:
System 2: MRXBOXAB-ECO5
A highly efficient, wall-mounted MVHR system ideal for energy-efficient apartments and homes. This version includes automatic summer bypass and is optimised for quiet performance and SAP compliance.
Installation Breakdown:
These systems provide continuous fresh air, while extracting stale, humid air, significantly improving indoor air quality and reducing heating demand.
This project demonstrates our ongoing commitment to high-efficiency ventilation solutions tailored to modern airtight homes-delivering sustainable comfort for residents.
40 Charter Street Wood Wharf E3 & E4:
Facts:
Main Contractor – Canary Wharf Contractors
Status: In Progress
40 Charter Street is located on the dock edge and features 552 build-to-rent apartments that are designed to focus on every day wellness and provide flexible accommodation optimised for the era of hybrid working.
At Ventflowuk we are pleased to announce that we have been contracted to supply and install, test and commission 552 apartments. The installations include efficient supply and installation of 552 Mechanical Heat Recovery Systems. Our dedicated team of specialist engineers ensure that all systems are fitted to the highest quality.
With our extensive knowledge, experience and commitment we always take pride in providing a professional, high quality service. Therefore ensuring a smooth completion of our work within project deadlines.
Chapter London Bridge
Facts:
Main Contractor – Mace
Status: Completed
The unique 39 storey building, Chapter London Bridge, offers accommodation for up to 905 students, flexible, affordable start up space and public realm improvements.
Student accommodation floors offer a wide range of living options, including self contained studios to clusters of two or three bedrooms with shared facilities and spaces for communal dining and socialising.
Ventflowuk have been contracted to supply, install and commission all MVHR systems including Fan coils in 902 student apartments.
We are dedicated to providing high quality work, whilst establishing long term relationships with our clients and exceeding their expectations.
Silvertown Plot 6:
Facts:
Main Contractor-John Sisk & Son
Status: Completed
Plot 6 consists of three 6-storey buildings designated for mixed-use development. Each structure will feature 5 levels of contemporary, affordable residential apartments, along with a commercial space on the ground floor that includes an integrated parking facility.
This initial phase of the comprehensive Silvertown regeneration project seeks to transform the Royal Docks into a vibrant 50-acre hub of commerce, culture and community.
Here at Ventflowuk we have a team of highly committed engineers, with an array of experience, knowledge and skills. We are excited to share our participation in this project, which includes the supply, installation, testing and commissioning of all Mechanical Heat Recovery Systems and Fan Coil units, providing energy-efficient ventilation and enhanced comfort for homes.
Wood Wharf B2:
Facts:
Main Contractor-Canary Wharf Contractors
Status: In progress
Wood Wharf B2 is situated at the periphery of Blackwall Basin in Canary Wharf.
The project comprises 279 serviced apartments, which we have been contracted to supply and install, test and commission. The installations include efficient supply and installation of 279 Mechanical Heat Recovery Systems and Fan Coil Units. Our team of specialised engineers are committed to ensuring that all systems are installed to the highest standards of quality.
Our dedication to achieving excellence is shown in our high-quality work. We pride ourselves in maintaining high standards of quality throughout the process, while consistently adhering to all specification requirements.
Wood Wharf G1 & G5:
Facts:
Main Contractor – Canary Wharf Contractors
Status: Completed
Ventflowuk successfully completed the supply, installation, testing and commissioning of 297 apartments at London’s prestigious Wood Wharf G1 & G5 development in 2024. This landmark project comprises of two 13-storey residential buildings, designed to reflect the historic character of the original wharf buildings, while delivering cutting-edge modern living.
Our scope included the full installation of 297 high-performance Mechanical Heat Recovery Systems (MVHR). The project was delivered by our experienced team of specialist engineers, who ensured every system was installed and commissioned to the highest level of quality and compliance.
Ventflowuk takes great pride in being part of this high profile development in the heart of Canary Wharf. Our commitment to professional, reliable service ensured the successful and timely completion of all works within project deadlines.
Palmerston Court
Facts:
Main Contractor: Mace
Status: Completed
Ventflowuk has now completed Palmerston Court project, which is located to the south side of Battersea Park opposite the New Battersea Power Station development. The development has provided accommodation for 850 students, comprising of 3 blocks ranging from 11-19 stories. There is also a new 11 story, 40,000 sq ft office building.
Ventflowuk has provided the supply, installation and commissioning of all ventilation systems at Palmerston Court. Our team of dedicated engineers and highly skilled technicians completed this project on time and within budget. With our extensive experience, our specialist engineers ensured each system was fitted to the highest quality.
Wembley Park Gardens
Facts:
£399,000 – £601,000
42 Brook Avenue, Wembley, London HA9 8PH
Main contractor: Barratt Homes
Status: Completed
Wembley Park Gardens is a fantastic new development in the heart of North-West London. Every home has a private outdoor space, where the residents will be able to enjoy the views across the Wembley skyline.
Here at Ventflowuk we have been contracted to supply, install, test and commission all 454 apartments. The installations include efficient supply and installation of 454 Mechanical Heat Recovery Systems. Our dedicated team of specialist engineers ensure that all systems are fitted to the highest quality.
The Hyde, Hendon
Facts:
Main contractor: L&Q
Status: Completed
The Hyde is located on Edgware Road, offering private and affordable homes, retail and commercial space.
At Ventflowuk we are pleased to have successfully supplied, installed, tested and commissioned 104 apartments. The installations included efficient supply and installation of 104 Mechanical Heat Recovery Systems.
We have a wealth of experience in installing high quality systems for large residential projects. Always ensuring completion of our work to a high standard, on time and on budget.
Cherry Park:
Facts:
Main Contractor-Unibail-Rodamco-Westfield
Status: Completed
Ventflowuk are extremely pleased to announce that they are involved in the new development Cherry Park. It will be one of Londons largest single-site Private Rented Sectors (PRS) schemes. Cherry Park is a £670m residential development, located next to Westfield Stratford City shopping centre and adjacent to the historic Olympic Park site.
Ventflowuk’s project delivery team take enormous pride in maintaining the highest standards. We have built a reputation of delivering the highest quality installation works, testing and commissioning that we are accustomed to. At Ventflowuk we have extensive experience in delivering products on time and on budget.
Meadowcroft Lodge
Facts:
• 59 Apartments
• MVHR systems
• Supply, install & commission
Principle Contractor: CField Construction
Status: In Progress
Ventflowuk is undertaking the supply, installation and commissioning of ventilation systems as part of a £23 million extra care housing development in Guilford, Surrey.
The scheme comprises of 59 one and two bedroom extra care apartments, together with a range of communal facilities, designed to support independent living for older residents within a high quality, purpose built environment.
Working under the principal contractor CField Construction, Ventflowuk’s scope includes installation of high efficiency Mechanical Ventilation with Heat Recovery systems, providing controlled, continuous ventilation to support excellent indoor air quality, occupant comfort and energy efficient performance. All systems are being installed and commissioned in accordance with current building regulations and the specific requirement of extra care accommodation.
This project further strengthens Ventflowuk’s experience within the care and supported living sector, delivering compliant, reliable ventilation solutions tailored to environments where resident wellbeing is paramount.
H West
Facts:
• 167 new homes
• A mix of 1, 2 and 3 bedroom apartments and houses
• 87 homes for private sale and 80 affordable properties
Main Contractor: Bellway London Partnerships
Status: In Progress
We are currently supplying and installing Mechanical Ventilation with Heat Recovery (MVHR) and Mechanical Extract Ventilation (MEV) systems at Barking Riverside – site H West. This phase of the project comprises of 167 new homes, including a mix of 1, 2 and 3 bedroom apartments and houses.
The systems are designed to improve indoor air quality and energy efficiency across the development, while supporting low-carbon living and compliance with current building regulations.
St George’s Hospital:
Facts:
Status: Completed
St George’s Hospital is one of the UK’s largest teaching hospitals in Europe and one of London’s largest children’s hospitals.
Ventflowuk were delighted to work with St George’s University Hospitals NHS Trusts refurbishment of the Renal Courtyard.
Ventflowuk has expertly supplied and installed 2 AHU systems and 1 extract systems.
Vabel Blackheath
Facts:
Main Contractor – Vabel
Status: Completed
Ventflowuk has been appointed to supply, install, test and commission high performance Mechanical Ventilation with Heat Recovery (MVHR) systems across all 63 units of this dual-block residential development in Blackheath. The building is divided into two blocks. An affordable block with 20 units and a private block with 43 units of mixed tenure and type.
One Nine Elms:
Location: London, SW8 5NN
Facts:
Main Contractor – Multiplex
Status: Complete
One Nine Elms was one of our key projects. This development consists of two of the tallest residential towers in Europe. A 56 storey City Tower and a separate 42 storey River Tower, which are linked together with a glazed bridge. This allows access to City Tower facilities. The 5 star luxury hotel includes a ballroom, luxury spa, club house restaurant and karaoke bar.
Ventflowuk’s team of skilled engineers successfully installed sustainable MVHR systems, Fan Coil units, Fire Rated Ductwork and all ductwork insulation. Having earned our reputation due to our consistency of high quality workmanship and project delivery, we were honoured to contribute to this prominent Multiplex project.
The Church End
Facts:
• 99 new council homes in Brent
•The new homes will include 1, 2, 3 bedroom apartments
Main Contractor – Wates Residential
Status: In Progress
Work is currently in progress for the full ventilation system installation for a 99-apartment residential development. This includes the installation of ductwork, as well as the integration of Joule Modular Exhaust Air Heat Pumps (EAHP) and Green Comfort MVHR systems. The systems are being installed to provide energy-efficient, low-carbon ventilation and heat recovery , in line with current building performance standards.
Goodluck Hope:
Facts:
Main Contractor- Ballymore.
Status: Completed
Ventflowuk are very proud that we were involved in the exciting development located at Leamouth Peninsula, preserving Londons Maritime history.
Surrounded by Londons most famous waterway, an Island destination, ’Goodluck Hope’ that has been built on the industrial heritage of the capital.
Ventflowuk had a very dedicated team of engineers who worked around the clock to install, test and commission 804 apartments on the island, whilst ensuring delivery of high-quality work.
Our installations of systems included efficient MVHR units, MEV systems and Air conditioning offering both energy efficient ventilation and good comfort for households.
With our extensive knowledge in our field we delivered a professional service, continuing to be in line with Ballymore programme measures.
At Ventflowuk we aim to guarantee deliverables are carried out with appropriate environmental protection measures associated with ductwork installation, effective use of material resources and waste management.
Goodluck Hope launched in 2021. At Ventflowuk we hope to have made our mark in the emerging of this island neighbourhood by its reputable installation within the homes.
Ventflowuk successfully completed this project, delivering our best work to the highest of standards.
Greenwich Sq Courtyard:
Facts:
Main Contractor- MACE
Status: Completed
Introducing a haven for residents in the heart of Greenwich,‘Greenwich Sq Courtyard’, is set around a stunning spacious garden square, full of green and an idyllic view.
Ventflowuk were contracted to supply and install MVHR systems in 325 residential studios, one, two and three bed apartments.
The modern design of the flats, allowed us to offer our expertise ensuring that the install was suitable in design and also advantages for the apartments.
With our knowledge and reputable services we completed installation within the client deadline. Ventflowuk further complied with all health and safety measures including recent COVID procedures whilst continuing to work.
We provided a great service working alongside Mace to ensure the smooth completion of our work, and the success of the project.
We successfully completed the project in November 2019 and are very pleased with the finished service.
Facts:
Main Contractor – Ballymore
Status: Completed
We have successfully completed project ‘Royal Wharf’, situated on the north bank of the River Thames, a residential and commercial development in Newham.
Ventflowuk delivered our personal best in assuring that all ventilation systems, were installed, tested, operated and maintained according to the requirements of our client.
We successfully completed the Leisure centre, provided fire-rated ductwork for the Swimming pool, installed energy-efficient air conditioning systems for the Gym.
We further continued our work with the completion of the Car park area and Community centre, all within the programme deadline.
Our dedication and drive enabled us to produce high-quality work throughout, as we achieved our goal to deliver the best of our work whilst consistently meeting all specification requirements.
Facts:
Status: Completed
Ventflowuk played an integral part to help deliver a beautiful, renowned project ‘Kings court’ located at the heart of Covent Garden. One of the most busiest, most attractive districts in London. A historic mixed development that composed of 45 luxury apartments.
We had a committed team of specialist engineers, working every day providing ventilation for the prestige apartments. With our reputable expertise, we certified each system fitted was the highest of quality, fit-out and suitable in design.
On this project our engineers installed MEV and air conditioning systems, taking care that they were suitably sized for the specific design. We liaised with the design team to deliver the best product choice to guarantee good air quality and maximum comfort.
We also supplied sustainable MVHR systems, that guarantee acoustic comfort and considerably reduce outdoor noise. It is also economical which helps the residents save energy and reduce its environmental impact on the environment.
Ventflowuk engaged in management through out the project ensuring we allowed space and time to work effectively.
We had a very strict scheduled which we adhered to, making sure our team worked to all of the client protocols, including health and safety procedures.
Ventflowuk excelled in this project and delivered our best work, completing the project in time for residents to enjoy the surrounding courtyard during the summer season.