The Church End
Facts:
• 99 new council homes in Brent
•The new homes will include 1, 2, 3 bedroom apartments
Main Contractor – Wates Residential
Status: In Progress
Work is currently in progress for the full ventilation system installation for a 99-apartment residential development. This includes the installation of ductwork, as well as the integration of Joule Modular Exhaust Air Heat Pumps (EAHP) and Green Comfort MVHR systems. The systems are being installed to provide energy-efficient, low-carbon ventilation and heat recovery , in line with current building performance standards.